Laying GRF System with ceramic
Guide to laying GRF System with ceramic slabs
1. THE SUBSTRUCTURE
Place the supports on the installation surface and adjust them to the desired height. To enhance the load-bearing capacity of the grids, it is possible to add a support in the center of each grid and/or at the center of the four sides.

2. THE GRIDS
Place the grids on the top of the supports, aligning them with the special slots provided, and interlock them using the "dovetail joint" connections
Achieve precise leveling of the grids using the adjustment key and a bubble or laser level tool.

3. THE FLOORING
Install the flooring elements (porcelain stoneware, marble, etc.), taking care to place the DLG spacer underneath the corners. The spacer serves the purpose of creating gaps and aligning the flooring elements. For vertical sealing, you can use a vertical perimeter profile of a plate edge profile paired with a base clip.

A solid substructure for each type of installation
Examples of laying with ceramic slabs
Diagonal square

Regular square

Running bond pattern

Multi-size pattern

Square with a 90° border

Square with a 45° border

Regular rectangle

Running bond rectangle
